QPV logo

Global solution

Advanced Quality Assurance Procedure: QPV’s methodology reduces performance uncertainty by more than 50%, what allows minimizing risk investment and improving financing conditions. Main steps are:

  1. YIELD REPORTING

    Initial calculation of the expected PV plant yield and the economic revenues along the project’s lifetime.

  2. DESIGN AND SPECIFICATIONS

    Project design and description of the equipment’s technical requirements.

  3. REFERENCE MODULES CALIBRATION

    Calibration of reference modules as irradiance and temperature sensors.

  4. PV MODULES’ QUALITY CONTROL

    Inspection and measurement of PV modules’ state and performance at their delivery.

  5. COMMISSIONING

    Analysis of the PV installation’s performance and the fulfilment of the contractual specifications. It includes characterizing the main equipment and verifying the expected production.

  6. PVET PERFORMANCE ANALYSIS

    Continuous audit service for the operation phase and advanced monitoring oriented to O&M, performance and asset management optimization. It includes failure detection and diagnosis and high accuracy energy forecasting.

  7. TECHNICAL AUDITS

    Revision of the state-of-health of the installation at any moment of its lifetime: guarantee claims, performance anomalies, PV plant transactions.