DESIGN AND SPECIFICATIONS

OBJECTIVE

Advisory during the projecting phase to optimize the installation design.
We provide a technical specification set to assure the maximum equipment quality and performance.

QPV design and specifications

PROCEDURE

  • Electrical design and equipment sizing optimization
  • Yield maximization dependent on GCR
  • Peak versus nominal power analysis
  • Analysis of the different tracking strategies and their mechanical limitations.
  • Efficiency and durability equipment requirements
  • Adapted and personalized coverage beyond the international standards
  • Negotiation with providers

APPLIED REFERENCES

  • IEC – 61215, IEC – 50530,
    IEC – 50380, IEC – 61646,
    IEC – 61724
  • PVCROPS Standards

PROJECTS OF
THE QPV TEAM

TOTAL
INSTALLATIONS

89

TOTAL
POWER

1.014 MW
Number of installations Country Power (MW) Year
1 Mexico 70 2018
1 South Africa 92 2018
1 USA 66 2018
1 Portugal 50 2017
1 Kuwait 10 2017
2 Chile 296 2017
2 Spain 1,9 2017
2 South Africa 30 2016
1 Turkey 1 2016
1 Spain 6 2015
1 Peru 20 2015
1 Honduras 42 2015
1 Spain 2 2014
4 Italy 7,9 2014
1 Ecuador 3,5 2014
1 Spain 38 2013
1 Italy 2,6 2013
4 Spain 18,3 2012
3 Italy 10,9 2012
1 Brazil 1 2012
5 Italy 14,9 2011
1 France 4,5 2011
6 Spain 15,6 2011
6 Spain 16,6 2010
1 Portugal 45,8 2009
5 Spain 32,4 2009
22 Spain 84,8 2008
11 Spain 30,6 2007-6