TECHNICAL AUDITS

OBJECTIVE

Measure and evaluate the performance of a PV installation during any moment of its life time.
We analyse any specific anomalies, propose solutions and update the yield estimations.

Broken photovoltaic module
Hot spot in photovoltaic module
Dirt effect on photovoltaic modules

PROCEDURE

  • Visual inspection and control during the construction phases.
  • Hot-spot impact measurement: early degradation, individual and operating power losses.
  • Diodes and connecting boxes anomalies.
  • Losses due to potential induced degradation.
  • Equipment ageing analysis.
  • Dust impact on individual and operating power and mismatching increase. Cleaning campaigns planning.
  • Revision and recalibration of the meteorological stations and the operating conditions’ sensor.
  • Monitoring system validation.

APPLIED REFERENCES

  • IEC –60904-1; IEC –61829;
    IEC –60891; IEC –62446;
    IEC –61724

PROJECTS OF
THE QPV TEAM

TOTAL
INSTALLATIONS

131

TOTAL
POWER

3.553 MW
Number of installations Country Power (MW)
1 Australia 24
5 Brazil 121
3 Chile 448
1 Dominican Rep. 60
1 Ecuador 4
3 Egypt 186
1 France 5
1 Honduras 49
13 Italy 37
2 Jordania 130
1 Kuwait 10
6 Mexico 865
1 Peru 20
1 Portugal 96
4 map.countries.russia 60
3 South Africa 122
83 Spain 1250
1 USA 66